Lundy were recently awarded the contract from Amey Rail for the design and installation of a new signal gantry along with associated lineside civils, UTX,s , LOC platforms for the Stalybridge, Manchester Project. The structure was located on an elevated viaduct in the centre of Stalybridge and with the foundations aayo sharabi adhi raat rajasthani mp3 song mounted outside of the parapets required accurate setting out to ensure final fitment.

 

Installation of the structure legs on foundations outside the parapet walls.

 

 

Installation of the gantry as viewed from track. All completed in a single shift.