Overhead Electrification- OLE

Lundy provided a large proportion of the West Coast Main Line OLE structures including Wilmslow, Trent Valley, Rugby, Nuneaton, Milton Keynes.

 

Lundy manufacture and installation of OLE structures at Reading Station.

Structures are tied into canopy main steelwork.

 

ole-reading

 

Reading Station starts to take shape.

Lundy team installing OLE structures to station canopy.

 

ole-reading2

 

Lundy were awarded the manufacture, piling and installation of the overhead electrified structures through Reading Station and onto the Great Western Line. A successful Xmas blockade puts the team on a strong footing to deliver this sector of work on time.


The Lundy scope includes the Depot, the Main Station and the outer East and West fringes of the route.

 

ole-reading3

 

Xmas 2012 installation Electrification Great Western

ole-great-western1

 

ole-great-western2

Latest News

03 November 2014
thameslink-london-bridge-projectThameslink London Bridge project 3500 delivered on time and in...
06 June 2014
its-a-firstIts a First: Lundy erect the first OLE structures on the...