Glasgow Project

Lundy Projects were awarded the lineside civils and signalling project for the Paisley Corridor-Glasgow by Invensys Rail.

 

The project consisted of 17 x 4track signal gantries and foundations, 78 signal posts and foundations, 12 UTX's , numerous LOC platforms,foundations and stillages. 40km troughing, REB's PSP's and DNO's.

 

All works were successfully completed on time including recoveries.

 

One of the 17 gantries designed, manufactured and installed by Lundy in Glasgow

glasgow-gantry

 

The images below show:

  • Numerous LOC installation at both grade and on embankments, including 8km of tro-tread were installed
  • The heavy haulage was invaluable when gantries were installed from off the M8 motorway running adjacent to sections of the route. The gantries were hauled in one complete bolted section and lifted over rail from off the motorway during lane closures at night

Latest News

11 October 2017
alpiq-is-acquiring-lundy-projects-ltd    Alpiq is acquiring Lundy Projects Ltd  Alpiq is optimally qualified as...
03 November 2014
thameslink-london-bridge-projectThameslink London Bridge project 3500 delivered on time and in...

Articles by Month

News & Events

Other Information

Follow Us